Water Boring in Progress
|
| |
Setting up drill head
|
Drilling rig
|
Drilling rig reaching up to the sky
|
10.58am - Boring rig in operation
|
Tony (left) & Haidar looking dirty but satisfied
|
Haidar hard at work
|
Bore hole surrounded by sludge
|
Thumbs up from Tony - obviously happy with progress
|
Sludge improving - a good sign
|
Bore samples - improving from left to right
|
Tony - beaming with flow
|
Flow looking good
|
4.43pm - Flow looking much better
|
Looking better still
|
Eruption
|
Big splash
|
Flange welded to casing
|
Drill samples @ 3 metre stages to crackout = approx. 43 metres down
|
Drill samples @ 3 metre stages to crackout = approx. 43 metres down
|
Water level, 6 metres down bore casing
|